Phase 3 Under development Exciting new additions
Be the first to love this image
Added 1607005002 by Rawpics Studio.
Hi Everyone,
Just to let you know the studio, is now going through Phase 3
Work starts on Monday 15th feb and the studio will be closed until the 8th of march. I am having a huge infinity wall / curve at one end of the studio. There will be new interior walls going in with insulation to accommodate the new industrial heating system. Along with a new changing room for the models.
I will also will be fitting an electric winch to the roof so we can shoot Ariel hoops, trapeze and silks. There will also be 4 wall sections with 3D backdrops along with the various backdrops already available. Its a really exciting time ahead and when we get back to some form of normality I will look to have an open day / evening for you'll to come along and have a look around.